中文字幕久久精品,日韩美女诱惑,福利在线免费视频,国产精品久久久久影院嫩草,亚洲免费成人在线,最新国产精品自拍,久久久女人

Transferred from-Mysteel: Tracking the production of the wrong peak of Tianjin Iron and Steel Enterprise

發(fā)布時(shí)間:[2019-1-12 9:23:49]    瀏覽量:3260次
[Introduction]
It is predicted that heavy pollution will occur in our city from January 11, 2019, in line with the yellow warning conditions for heavy pollution weather stipulated in the "Tianjin Heavy Pollution Weather Emergency Plan"(Tianjin Administrative Office Letter[2018] No. 65). A yellow warning of heavy pollution weather is hereby issued.
The people's governments of various districts and the responsible units are requested, in accordance with the division of responsibilities of the "Tianjin Heavy Pollution Weather Emergency Plan", to initiate Class III emergency response measures from 0:00 on January 11 to do a good job in dealing with heavy pollution weather.
[Survey sample profile]

1, the blast furnace survey sample selected a total of 7 parent flow steel mills in Tianjin, 16 blast furnaces, and the total design capacity of blast furnace was 20.3 million tons. At present, 11 blast furnaces are normally produced, and 5 blast furnaces are discontinued. According to the work plan of industrial enterprises in the 2018-2019 heating season of Tianjin, we investigated the production limit rating and actual production limit of various steel companies:


According to the construction of the above-mentioned steel mills, it is estimated that the actual operating rate of the 7 parent flow steel mills in Tianjin is 70 %.

2, rolling line survey samples involved building materials, wire, medium thick plate, strip steel, profile, seamless pipe a total of six varieties, a total of 29 rolling lines.
There are 5 building materials production lines(thread, round steel production lines), 3 normal production, the main production round steel, the discontinued 2 are long-term suspension of production, not affected by the heating season production limit.
There are 6 wire production lines(high lines, variety lines), 2 normal production, and the main production variety lines, 4 discontinued production is a long-term suspension of production, not affected by the heating season production limit.
The production line of medium thick plate is 1, and the output is slightly below the normal level.
There are 8 steel production lines, 7 normal production lines, and 1 production line upgrade.
There are 3 profiles and 1 line production.
Seamless tube production line 6, 1 normal production, adjustment of blank rolling material.

HomeBrief IntroductionOrganizationLetter Bridge NewsProduct CenterAptitude HonorHuman ResourcesContact Us

Mailbox:taxinqiao@163.com    Website:ioyoq.com
Shandong Xinqiao Industrial Co., Ltd.  Copyright         Technical support:Nuodun Network
Headquarters:0538-8151706    Fax:0538-8151704 Address:The new North Road of the steel market of Tai'ant
Branch:0538-5018001      Fax:0538-5018004 Address:Tai'an national Mountain Center

仁布县| 永寿县| 商都县| 哈尔滨市| 青海省| 霞浦县| 宜黄县| 河南省| 治多县| 新营市| 尼勒克县| 中超| 咸阳市| 阿巴嘎旗| 承德县| 将乐县| 泾源县| 方山县| 望都县| 米易县| 梁山县| 威宁| 同德县| 永平县| 龙川县| 抚松县| 长寿区| 通江县| 绥棱县| 墨玉县| 弥渡县| 莱州市| 保定市| 慈溪市| 南宁市| 汾阳市| 濮阳市| 拉孜县| 淮南市| 中山市| 阳曲县|